Cabinets and boxes

Switching boxes and electrical cabinets wired to your drawing

From a passive relay box to a complete control cabinet, we design, wire, label and test under power before delivery.

Send a drawing
Open electrical cabinet with labelled relays and terminals
Wired and labelled cabinet. Design view.

Three families

Test switching boxes

They replace manual rewiring between a bench and the product under test: mode selectors, break-before-make relays, interlocks and status lamps.

  • Bench terminals and product connector
  • Freewheeling diodes, protections
  • No embedded measurement: results stay on your instruments

Control cabinets

Power supply, protection, relays or PLC, drives, hard-wired safety chain. Delivered with as-built diagrams.

  • Labelled conductors and terminals
  • Tested under power before shipping
  • Drawings in the format you use

Panels and front plates

Front plates machined and engraved in our workshop, buttons, lamps, touch screens, emergency stops, all wired and ready to connect.

  • Engraved markings and text
  • Stainless steel or anodised aluminium
  • Ergonomics validated with your operators

Example: electrical test switching box

An aerospace supplier was rewiring by hand between three families of tests, one of them in three sub-modes. Every change was a source of error.

We delivered a passive box with two rotary selectors and seven lamps. Break-before-make relays and an interlock rule out any dangerous configuration. The existing bench and its instruments remain unchanged.

  • Four labelled terminal blocks on the bench side
  • Product interface by connector and labelled terminals
  • Manufacturing lead time: two weeks
ModesThree families of tests, one of them in three sub-modes
SwitchingBreak-before-make relays, mechanical and electrical interlock
IndicationSeven status lamps, one per active configuration
Bench interfaceFour labelled terminal blocks to the bench instruments
Product interfaceDedicated connector and labelled terminals
MeasurementNone. Results are still read on the bench instruments
Lead timeTwo weeks

Our workmanship rules

  • Every conductor labelled at both ends
  • Colours and cross-sections to your standard or to the norm
  • Hard-wired safety chain, independent of the software
  • Powered tests and point-to-point check before shipping
  • As-built diagrams delivered with the box
  • Component brands distributed in Tunisia for easy maintenance

Let's talk about your next test equipment.

Send us a specification, a drawing or just an idea. We come back within two working days with a first architecture and a budget.